PTO Granted |
Congratulations!
Your solar system now has Permission to Operate
(PTO) from your utility company and can be turned on!
Your Solar Status

During this step, someone from your utility company may come out to
inspect the solar system and upgrade your current meter for a
bi-directional or net meter that can track your energy to/from the
utility company.
This step typically takes about 2-4 weeks and typically does not require
any follow-up.
We will let you know when PTO is granted.
Feel free to contact us at (727) 375-9375 or interconnections@gosunergy.com
if you have any questions.
Thank you!