Welcome to the Sunergy family!

We appreciate your trust in Sunergy to install your solar system,
and we are confident that you will greatly benefit from this decision.


house with solar

Now that you have made the decision to go solar, we would like to inform you of the steps in the process and estimated timelines. There is a lot that goes into installing a solar system, and we will work with you every step of the way so that this process is as convenient and smooth as possible.

Site Evaluation
We will get pictures and measurements of the following to create a draft design: your roof, electrical panel, and the attic if needed. We are currently working on this step.

Engineering
We will draft an official design for your solar system and obtain any supporting engineering documents. This takes about 2-4 weeks.

Permitting
Your municipality approves the design and gives us a permit to install your solar system. This takes about 3-9 weeks.

Installation
We install your solar system and confirm that it will operate correctly. This may take 1-5 days from the scheduled time.
*Any additional equipment will be installed after as your system progresses through the next few steps.

Inspection
Your municipality will inspect your solar system and confirm that it was installed in accordance with the approved design and current regulations. This takes about 2-6 weeks.
*If they find something that requires an adjustment, we will work to get that fixed and reinspected as quickly as possible but that will extend the listed timeline.

Permission to Operate
Your utility company will enable net metering and give you permission to operate your solar system. This takes about 2-6 weeks.

Finalization
We will verify that the system is operating normally, give you monitoring access, confirm that all deliverables in the Installation Agreement have been met, and provide essential documentation regarding your solar system.

Please keep in mind that these are average timelines and that actual timelines will depend on your municipality, utility company, regulations, and other changes or delays that may occur.

We will send you periodic email updates (like this one) as you progress through this process. We will also contact you regularly with any updates throughout the process. You are also welcome to contact us at any point in time at (727) 375-9375 or support@gosunergy.com, and we will be happy to assist you.

Thank you for choosing Sunergy! We are excited to welcome you into the solar family!






Copyright 2024 Sunergy
7625 Little Rd STE 200a New Port Richey, FL 34654
Privacy Policy

Sunergy Contractor Licenses
Sunergy maintains the following licenses in Florida, Missouri, Ohio, Texas, and Utah. For information about additional licenses, see the license information on gosunergy.com. If we use subcontractors to install the System, we'll provide you with their names and license numbers upon request.

Florida: Solar Contractor License #CVC56996, HVAC Contractor License #CAC1818672
Florida Department of Business and Professional Regulation: (850) 487-1395.
Missouri: Master Electrician License #2023039034
Ohio: Electrical Contractor License #47791
Texas: Electrical Contractor License #34876, Master Electrician License #233583
Utah: Master Electrician License #12194795-5502